- Home //
- Featured Projects //
- Hazel Grove Primary School
Hazel Grove Primary School
- CLIENT: Stockport Metropolitan Borough Council
- CONTRACT VALUE: £680,676
- SECTOR: Education
- ARCHITECT: David Trowler Associates
- ENGINEER: Charles Andrews Ltd
- EMPLOYERS AGENT: Stockport Metropolitan Borough Council
The contract works with our repeat client, Stockport Council, included extensive remedial works to the building to create a modern new teaching space for the key stage 1 and 2 year groups. The works included the replacement of the roof coverings to both the tiled pitched roof, and the felt membrane flat roof together with the formation of new gutters and valleys and the repointing of the ridge tile sand re-bedding of the original stone copings.
New timber windows were installed to match the original style and comply with planning and heritage requirements.
Internally, new mechanical and electrical systems and services were installed throughout to ensure that the building worked more efficiently in terms of heating, power, general energy consumption and performance.
All finishes were installed to the building including new flooring, ceiling and wall finishes together with acoustic panelling and joinery works to create a new modern internal feel within the external heritage building structure.
HAVE A PROJECT IN MIND?
Complete our quick and easy form here and we'll be in touch to chat about your project.
Or, give us a call on 0161 654 8435 or email us on info@jgb.co.uk.