Grosvenor Garden Centre

  • CLIENT: 4th Duke of Westminster
  • CONTRACT VALUE: £0.5m
  • SECTOR: Industrial
  • ARCHITECT: Crosby Granger / Gerald Eve
  • ENGINEER: RG Parkin & Partners / Evora Edge
  • EMPLOYERS AGENT: Gerald Eve

The works included the construction of a new steel-frame industrial building to replace the original storage facility for the Garden Centre client, and new deep strip foundations with a ground bearing slab. A steel frame structure was built to support the roof covering, a masonry external wall to the base of the building and timber cladding to the higher levels.

Externally, the surface car park and perimeter are finished in Tarmac, with surface water drainage and attenuation provision. Internally, the building provides new lighting and power with racking provision for multiple storage requirements.

Grosvenor Garden Centre Feature Image
Grosvenor Garden Centre Feature Image
Grosvenor Garden Centre Feature Image
Grosvenor Garden Centre Feature Image

HAVE A PROJECT IN MIND?

Complete our quick and easy form here and we'll be in touch to chat about your project.

Or, give us a call on 0161 654 8435 or email us on info@jgb.co.uk.